Barrier Gate Suppliers in Dubai, United Arab Emirates

Compare verified Barrier Gate suppliers serving your city. Find automated vehicle barrier gate system providers across Saudi Arabia and UAE, review boom length options, opening speeds and certifications, then request quotations from qualified suppliers through Kablet.

Verified Suppliers
Free RFQ
Dubai Coverage
GCC Network

Procurement Snapshot

2 Suppliers Available
Dubai Coverage Area
2–5 weeks Typical Lead Time
Yes Single Unit Orders
CE, IP54, SASO Common Certifications

Specifications

SpecificationValue
Opening Time1-3 seconds
Boom Length3m to 6m
Power110-240V AC
ProtectionIP54
CertificationCE

Procurement Insights

Typical Lead Times

  • Stock items: 2–3 weeks
  • Custom orders: 5+ weeks

Common Certifications

CE IP54 SASO

Common Buying Requirements

  • Warranty period (minimum 1 year)
  • Installation and commissioning support
  • Loop detector and remote control included
  • Spare parts availability
  • SASO certification (Saudi Arabia)
  • Integration with existing access control

Applications

Parking facilities, Shopping malls, Industrial sites, Residential compounds, Corporate offices, Airports and ports, Toll stations

Procurement Information in Dubai

Dubai is the UAE\'s largest commercial hub and a global trading center, home to Jebel Ali Free Zone — one of the world\'s largest free zones. Industrial procurement is driven by large-scale construction, logistics, hospitality and technology infrastructure projects across the emirate.

Barrier gates in Saudi Arabia and UAE are supplied by authorized distributors with local technical support. SASO certification is required for electrical equipment in Saudi Arabia. Buyers should specify boom length, opening speed, loop detector requirements and integration with access control systems when requesting quotations.

Verified Suppliers in Dubai

Stebilex Systems Saudi Arabia Distributor
Verified

Stebilex Systems is a trusted access control systems distributor in Riyadh, Saudi Arabia, supplying premium products from world-class brands including Idemia, HID, Paxton and FAAC to system integrators and resellers across the Kingdom.

Coverage Riyadh, Jeddah, Dammam, Dubai, Abu Dhabi
Certifications CE, FCC, ISO 9001
Lead Time 1–4 weeks
ID Vision Distributor
Verified

ID Vision is one of the leading access control system suppliers in Dubai, UAE, offering solutions from single-door systems to large integrated systems managing thousands of doors across the GCC, authorized supplier of HID, Suprema and ZKTeco products.

Coverage Dubai, Abu Dhabi
Certifications CE, SIRA Compliant, ISO 27001
Lead Time 1–4 weeks

Supplier Comparison

SupplierTypeCoverageLead TimeCertificationsAction
Stebilex Systems Saudi ArabiaDistributorRiyadh, Jeddah, Dammam, Dubai, Abu Dhabi1–4 weeksCE, FCC, ISO 9001Quote
ID VisionDistributorDubai, Abu Dhabi1–4 weeksCE, SIRA Compliant, ISO 27001Quote

Frequently Asked Questions

Do Barrier Gate suppliers in Dubai offer installation and integration services?

Yes — most verified Barrier Gate suppliers in Dubai provide full installation, system integration and staff training as part of their supply package. Specify your integration requirements (CCTV, HR, building management) in the RFQ form.

What warranty do Barrier Gate suppliers in Dubai offer?

Most Barrier Gate suppliers on Kablet offer a minimum 1-year warranty with options for extended service contracts. Confirm warranty terms, on-site support availability and spare parts lead times when reviewing quotations.

Is cloud or on-premise management available for Barrier Gate in Dubai?

Both cloud-based and on-premise management options are available from Barrier Gate suppliers in Dubai. Cloud systems offer remote management and scalability while on-premise systems suit high-security environments. Specify your preference in the RFQ form.

How long does Barrier Gate installation take in Dubai?

Installation time for Barrier Gate depends on the number of access points and integration complexity. Single-door systems typically install within 1 day while multi-site enterprise systems may require 1-4 weeks. Suppliers will confirm timelines in their quotation.

Related Products

Barrier Gate Suppliers in Other Cities

Need Quotations from Barrier Gate Suppliers?

Submit one request and receive quotations from verified suppliers serving Dubai.

Submit RFQ

Request Quotations

Get quotes from verified Barrier Gate suppliers in Dubai.

Free to submit. Suppliers respond within 24-48 hours.